EFSEC Resolutions
The following Resolutions are issued from the Council. Further below the Resolutions are gathered by project/facility.

Project

Resolution #

Regarding

Date

  333 Recognition of Albert E. Wright 8/21/12
Columbia 332

Revisions to the Radiological Environmental Monitoring Program

2/21/12
BP Cogen 02-01 331 Amendment No. 4 - Cherry Point Cogeneration Project Transfer of SCA to BP West Coast Products, LLC 8/24/11
WNP-1 & 4 330 Amendment No. 2 to the Site Certification Agreement 4/13/10
  329 Recognition of Allen J. Fiksdal 2/9/10
Kittitas Valley Wind 328 Amendment No. 1 to the Site Certification Agreement 9/2/09
  327 No Resolution Associated with this number  
Columbia 326 Emergency Preparedness Offsite Agency Support 3/10/09
Chehalis 325 Transfer to PacifiCorp, Termination of TNA Merchant Projects' Guaranty and Approve of Revise Site Restoration Plan 9/22/08
  324 Recognition of Michael E. Mills 3/11/08
BP Cogen 02-01 323 Amendment No. 3 - BP to fund a project that would reduce water use at Intalco and make the unused water available for use by the Cogeneration project 3/11/08
BP Cogen 02-01 322 Amendment No. 2 - Transfer of SCA to New LLC, Removal of Certain Laydown Areas and Modification to Wetland Mitigation Provisions 3/11/08
Wild Horse Wind 321 Amendment No. 4 - Approval of Solar Demonstration Project 4/10/07
BP Cogen 320 Withdrawal of request to amend SCA and laydown use within NPDES permit 2/13/07
Wild Horse Wind 319 Amendment No. 3 - Installation of exempt well 2/13/07
Columbia 318 Removal of on-site Visitor's Center and closeout of Resolution No. 225 11/14/06
BP Cogen 317 Amendment No. 1 to BP Cogen Site Certification Agreement 10/10/06
Sumas 316 Sumas 2 Generation Facility - Termination of Site Certification Agreement 5/9/06
Wild Horse 315 Amendment No. 2 to the Wild Horse Wind Power Project Site Certification Agreement 7/26/05
Wild Horse 314 Modifications to the Wild Horse Wind Power Project Site Certification Agreement 7/26/05
WNP-1 & 4 313 WNP-1/4 Site Restoration - Offsite Environmental Mitigation 7/12/05
Satsop CT 98-1 312 Modifications to the Satsop Combustion Turbine Project Site Certification Agreement 1/11/05
Columbia
311 Emergency Preparedness Offsite Agency Support 1/11/05
Columbia
310 Energy Northwest - Columbia Generating Station: Termination of  Non-Radiological Environmental Monitoring Program 4/19/04
Satsop CT 98-1 309 Satsop Combustion Turbine Project - Technical Amendment - Water Use Provisions 4/19/04
Cowlitz 308 Cowlitz Cogeneration Project - Termination of Site Certification Agreement 3/1/04
Columbia
307
Energy Northwest - Disposal of Water Stored in WNP-1 and WNP-4 Service Water Ponds 9/8/03
Columbia
306 CGS Condenser Scale Removal 4/14/03
Wallula 305 Modifications to the Corporate Structure of Site Certificate Holder - Wallula Generation LLC 3/10/03
Chehalis 304 Water use mitigation - Hamilton Water Rights 3/10/03
Columbia 303 CGS Hydrogen Storage and Supply Facility 2/18/03
WNP-1 & 4 302 Site Restoration Plan Approval 12/9/02
Chehalis 301 Water use mitigation 11/12/02
Top of Page
Columbia 300 Columbia Generating Station Sanitary Waste Treatment Facility 9/10/01
Columbia
 
299 Columbia Generating Station Cooling System Sediments 8/13/01
Satsop CT 98-1 298 Technical amendments regarding facility design and backup fuel source at Satsop CT Site 4/13/01
Satsop CT 98-1 297 Addition of Duke Energy Grays Harbor LLC as Satsop CT SCA co-holder and co-permittee 2/12/01
Columbia
296 Hanford Wildlife Mitigation Project/Rattlesnake Slope Rehabilitation 11/13/00
Columbia
295 Amending the CGS SCA to allow for Construction and Operation of Dry Cask Storage Facility at the project site 9/11/00
KVA/NRPF 294 Avista Corporation termination of SCA for Creston Generating Station 1/24/00
Columbia
293
Amd. 1
Energy Northwest Change of Corporate Name/CGS Change of Plant Name 9/11/00
Columbia 293 Energy Northwest Corporate Name Change 12/17/99
Columbia
292 Approving upgrading and site preparation plans for WNP-2 8/10/98
  291 Commendation for services performed by Acting Chair, C. Robert Wallis 3/9/98
Cowlitz 290 Concluding that Chehalis Power's Report of November 6, 1997 satisfies the SCA requirements for consultation and reporting on the best means of gauging the Centralia Reach of the Chehalis River 12/8/97
KVA/NRPF 289 Approving the KVA water pipeline design and location 12/8/97
Columbia
288 Approval of WNP-2 Landfill Closure Plan, Post-Closure Plan and Plan of Operations 11/10/97
Columbia
287
Amd. 1
Approving FY 2002 EP funding levels for Columbia Generating Facility 6/19/01
Columbia 287 Accepting WNP-2 EP Study Group Recommendations Report 11/10/97
Columbia
286 Closure of WNP-2 NOI and Request for Assurance of Compliance concerning chlorination incidents in July 1996 9/8/97
KVA/NRPF 285 Land Management Plan Conditions 9/8/97
      Top of Page
WNP 3/5  284 Granting temporary waiver of water quality standards to complete bank protection repairs at the barge unloading facility at the WNP-3/5 Site 8/18/97
Satsop CT - 94-1 283 Deferring installation of the river flow monitoring gauge at the Satsop CT project 5/12/97
  282 Commendation for services performed by former Chair, Frederick S. Adair 1/13/97
Cowlitz 281 Cowlitz SCA to extend for 18 months and removing Mission Energy as a co-sponsor 2/12/96
WNP 1/4 & 3/5 280 Site Restoration; Close out of Resolutions 243,245 & 246 6/12/95
Creston 279 Termination of Creston Generating Station SCA 5/9/95
Columbia 278 Authorizes the Onsite Disposal of Cooling Tower Sediments 5/8/95
WNP 3/5 277 Timber Harvest Proposal Conditions 4/10/95
WNP 3/5 276 Excavate 40 yards of Sediment with Conditions 3/13/95
WNP 3/5 275 Management of Wildlife Mitigation 11/14/94
KVA 274 Assignment of ALJ Wallis 10/10/94
Columbia 273 Increase Power Output 9/12/94
Cowlitz 272 SCA Amendment 9/12/94
Columbia 271 Closes Resolution No. 268 Water Discharge 8/8/94
Air Permitting Policy 270 Operating Air Permits 6/20/94
  269 Warren Bishop 6/13/94
Columbia
Cowlitz
268
268-1
NPDES Closes Resolution No 258
SCA Amendment
10/11/93
5/16/94
Cowlitz 267 Demolition of Plywood Mill 9/13/93
Columbia/ WNP 1/4 266 Nonradiological Environmental Monitoring Program 5/10/93
WNP 3 265 Fire Water System 3/8/93
  264 Nancy Burnett 2/8/92
WNP 3 263 Closes Council Orders 656, 657 & 659 2/8/93
Trans Mountian Pipeline 262 Low Point Application Submittal with Conditions 3/9/92
WNP 3/5 261 Approval of Forest Practices Application with Conditions 3/9/92
Columbia 260 Approval of Radiological Environmental Monitoring Program 1/13/92
Columbia 259 - 1 Approval of Operation of Sanitary Waste Treatment Facility 11/14/94
Columbia 258 Amended Standby Service Water System 8/10/92
  257 Closes Multiple Resolutions 6/10/91
WNP 3 256 Permission to Burn the Slash and Alder Debris with Conditions 4/8/91
WNP 3/5 255 Approval of Timber Harvest with Conditions 4/8/91
WNP 3/5 254 Approval of Satsop Power Plant Site Wildlife Mitigation Plan 8/13/90
  253 Abolish Council Executive Secretary 8/13/90
WNP 3/5 252 Approval of Timber Harvest with Conditions 7/9/90
Columbia 251 NPDES Condition G35 Fulfilled 6/11/90
WNP 3/5 250 Approval of Forest Road Construction 5/14/90
Columbia 249 Approval of the Use of Sodium Bromide as Bio fouling Agents with Conditions 5/14/90
WNP 3/5 248 Adopts Interim Agreement on Wildlife Mitigation and Timber Management 8/28/89
Creston 247 Approval of Initial Site Restoration Plan 6/26/89
WPPSS 4 & 5 246 Approval of Petition to Postpone Consideration of Site Restoration Plans for WNP 4 & WNP 5 with Conditions 10/10/88
Amended 1/14/91
WNP 3 245 Approval of Initial Site Restoration Plan for WNP 3 upon Approval of Site Restoration Plan of WNP 5 8/22/88
      Top of Page
Columbia 244 Approval of Initial Site Restoration Plan 8/22/88
WNP 1/4 243 Approval of Initial Site Restoration Plan for WNP 1 upon the Approval of Site Restoration Plan of WNP 4 8/22/88
WNP 3/5 242 - 2 Approval of Continued Use of the Septic Tank System with Conditions 6/13/94
4/11/88
Creston 241 SCA shall continue in full force and effect during Council consideration of WWP Application Amendment 2/8/88
Columbia 240 Adoption of Review Process for Circulation Water Additive Requests 12/14/87
Columbia & WNP 1/4 239 Approval of Revision No 3 - Review of Environmental Monitoring Program for WNP 2 9/14/87
Columbia & WNP 1/4 238 Approval of the Wildlife Mitigation Plan with Conditions 5/1/87
WNP 3 237 Abide by an Oil Spill Prevention and Countermeasure Plan and Hazardous Waste Management Procedure with Conditions 12/8/86
WNP 3 236 Storm Water Runoff Chemical Treatment Facility for NPDES 12/8/86
WNP 1/4 235 Removal of Wood Waste on WNP 1 & 4 by Controlled Burning of Wood Waste with Conditions 8/25/86
WNP 1/4 234 Statement of Compliance with SCA Conditions on WNP 1/4 8/25/86
WNP 3/5 233 Close of multiple Resolutions 6/9/86
WNP 3/5 232 Conditions Satisfied - Erosion Control during Construction 6/9/86
BPA 231
Amended
Taft Bell Transmission Line Construction and Council Closed its involvement. 4/14/86
Columbia 230 OL Amendment Checklist Accepted 3/24/86
  229 Policy - Develop Process to determine if additional Public Health, Safety and Environmental Protections are needed 1/27/86
Columbia 228 Approval of Deployment of Gamma Detectors 1/13/86
WNP 3/5 227 NPDES Closes Multiple Resolutions 8/26/85
WNP 3/5 226 Water Quality Sampling Program Closes Multiple Resolutions 8/26/85
Columbia & WNP 1/4 225 Visitors Center with Conditions 12/10/84
Columbia 224 Compliance Determinations & Implementation of Corrective Action with Conditions 11/26/84
Columbia & WNP 1/4 223 Approval of Termination of Sampling at the Three Burned Sampling Sites 10/29/84
WNP 3/5 222 Grants a Temporary Waiver of the Water Quality Standards with Conditions 6/11/84
WNP 3/5 221 Hydrazine and Cortec may be Discharged as part of the Metal Cleaning Waste Water Stream with Conditions 6/11/84
BPA 220 Adopts the Work Program/Intent to review the Lower Monumental/ Ashe Transmission Corridor 3/12/84
Creston 219 Approval of Recommendation and the Lincoln County Agriculture Coalition be granted membership 7/25/83
WNP 3/5 218 Fulfilled Condition VI.A.1 of SCA 7/11/83
WNP 3/5 217 Closes Multiple Resolutions 5/23/83
WNP 3/5 216 Closes Multiple Resolutions Authorizes a Reduction in the Erosion Control Program with Conditions 3/28/83
WNP 3/5 215 Approval of Construction Plans/Temporary Waiver of Water Quality Standards with Conditions 11/22/82
Columbia 214 Approval of Ecological Monitoring Program 11/8/82
WNP 3/5 213 Approval of Increase in the Inventory of Mineral Oil and the Storage of Transformers 11/8/82
WNP 3/5 212 Authorize the Requested Extension of the In-River Work Time Window 9/13/82
WNP 3/5 211 Terms and Conditions of Resolution #160 Fully Met and Satisfied 8/23/82
WNP 3/5 210 Terms and Conditions of Resolution No 178 Fully Met and Satisfied 8/9/82
Columbia 209 Requirements of Order No. 544 Fully Satisfied 8/9/82
WNP 3/5 208 Approval of Concept of the Approach Outlined in the Decommissioning Process with Conditions 7/26/82
WNP 3/5 207 Turbidity Waiver for Supplemental Dredging and desilting Operations 7/26/82
WNP 3/5 206 Temporary Waiver of the Water Quality Standards with Conditions 7/12/82
WNP 3/5 205  Multipurpose Facility for WNP 3/5, Visitor Center, Emergency Operations, and Training. Supersedes Resolution No. 199 6/28/82
WNP 3/5 204 Approval of Construction Plans for Installation of the Makeup Piping and Electrical Cables/Granting Temporary Waiver Water Quality Standards 5/24/82
WNP 3/5 203 Approval of Construction  Plans for Installation of Discharge Piping and Blow down Diffuser Granting Temporary Waiver of Water Quality Standards 2/22/82
WNP 3/5 202 Approval of Procedure Manual for Bioassay Program 2/22/82
Columbia 201 Deems Study of Effects of Non-toxic Chlorine Enhancement Agents and Corrosion Inhibitors on Biocidal Efficiency to be properly within the Scope of the Chlorination Studies Required with Conditions 1/25/82
      Top of Page
WNP 3/5 200 Approval of Modifications in the Environmental Monitoring Program 1/11/82
WNP 3/5 199 Affirms the concept of a multipurpose Facility for Visitor Center, Emergency Operations Facility, Control Room and Training Office with Conditions 10/26/81
  198 Establishes Committees: Executive, Application Review, Certificate Compliance 9/28/81
WNP 3/5 197 Approval of Oil Spill Prevention and Counter Measures/ Rescinding of Resolutions # 149 & 158 8/24/81
  196 No Resolution Associated with this number
WNP 3/5 195 Approval of Modification to Ecological Monitoring 6/22/81
Columbia & WNP 1/4 194 Approval of Adopted Terrestrial Monitoring Component of the Environmental Monitoring Program 5/26/81
Columbia & WNP 1/4 193 Approval of the Adopted Terrestrial Monitoring Component of the Environmental Monitoring Program 5/26/81
Columbia 192 Attachment 1 WNP-2 SCA Revision 2 5/26/81
Northern Tier Pipeline 191 Establishing a Steering Committee for the Purpose of Organizing and Managing the Review of the Contested Case Record 3/23/81
WNP 3/5 190 Granting a Turbidity Waiver  for Supplemental Dredging and Disilting Operations Associated with the Barge Unloading Facility with Conditions 3/23/81
WNP 3/5 189 Grant a Temporary Waiver of the Water Quality Standards with Conditions 3/9/81
WNP 3/5 188 Council Finds that the New Programs will Adequately Protect and further Reduce the Impact on the Environment. 1/26/81
WNP 3/5 187 Rescinding of Resolution No 147 1/26/81
Columbia 186 Pre-Operational Monitoring Program as Proposed shall be deemed to Satisfy the Monitoring Requirements of the NPDES 11/24/80
WNP 1-5 185 Low Volume Wastes 11/24/80
WNP 3/5 184 Contract for Water 10/27/80
WNP 3/5 183 Approval of Construction Plans for the Transporter Haul Road 9/22/80
WNP 3/5 182 Extend the Turbidity Waiver and Time period for Construction of Bank Protection on the North Shore of the Chehalis River 9/8/80
Trans Mountain Oil Pipeline 181 Extension of the 12-Month processing period 8/11/80
WNP 3/5 180 Grants a Turbidity Waiver during Construction Work With Conditions  
WNP 3/5 179 Grants Temporary Waiver of the Water Quality Standards with Conditions 6/9/80
WNP 3/5 178 Resolve of Resolution No. 147 5/27/80
WNP 3/5 177 Grants Temporary Waiver of the Water Quality Standards with Conditions 5/12/80
  176 Washington State Implementation Plan to Attain and Maintain National Ambient Air Quality Standards 5/12/80
Columbia & WNP 1/4 175 Approval of the Adoption of Terrestrial Monitoring Component of the Environmental Monitoring Program 4/28/80
Columbia & WNP 1/4 174 Approval of the Sanitary Waste Disposal System 4/28/80
WNP 3/5 173 Grants Temporary Waiver of the Water Quality Standards with Conditions 4/28/80
WNP 3/5 172 Approval of Extension of the Turbidity Waiver for the F-3 Pump Pond Effluent with Conditions 4/28/80
WNP 3/5 171 Rescinding Resolution No. 128 4/28/80
WNP 3/5 170 Approval of Construction o the Make-up Well System as proposed with Conditions 4/28/80
WNP 3/5 169 Grants a Temporary Waiver of the Water Quality Standards with Conditions 4/28/80
  168 To Equitably Share the Costs of Developing an Emergency Response Plan 4/14/80
WNP 3/5 167 Rescinding Resolution No. 124 4/14/80
Columbia & WNP 1/4 166 Grants Termination of the Preoperational Aquatic Ecology Data Collection for WNP 2, 1/4 3/24/80
WNP 3/5 165 Approval of Proposed Objectives and General Design of the WNP 3/5 Facilities and Concept only 3/24/80
WNP 3/5 164 Rescinding Resolution No. 154 3/10/80
Northern Tier Pipeline 163 Council Adoption of Procedures to Regulate the processing of Application No. 76-2 2/25/80
WNP 3/5 162 Approval of Single Surface Water Sampling Site to Determine Background Level 2/1/80
WNP 3/5 161 US Geological Survey Flow Gauge Established for Chehalis River 12/10/79
WNP 3/5 160 Rescinding Resolution No. 147 11/13/79
Northern Tier Pipeline 159 Adoption of Structure and Regulation for the Conduct 11/13/79
WNP 3/5 158 Approval of Supplement to Oil Spill Prevention and Countermeasure Plan with Conditions 10/29/79
Columbia & WNP 1/4 & 3/5 157 Not requiring Scientific Collector permits for the Conduct of Studies 9/24/79
WNP 3/5 156 Application for Modification of the Site Certification Agreement is Dismissed 8/27/79
Northern Tier Pipeline 155 Intent to Commence the Contested Case Hearing 9/10/79
WNP 3/5 154 Grants Approval for Construction of the Pioneer Rd with Conditions 8/13/79
WNP 3/5 153 Approval of Erosion Control Plan with Conditions 7/9/79
Columbia 152 Granting Relief from Monitoring of the Emissions of the Emergency Diesel Engines and Auxiliary Boiler 6/11/79
WNP 3/5 151 Approval to Remove P-1, P-3 and W-1 Pump Stations 6/11/79
      Top of Page
WNP 3/5 150 Granting a Turbidity Waiver during Construction of the Laydown Area with Conditions 6/11/79
WNP 3/5 149 Rescinded Council Resolutions 142 & 144 with Conditions 6/11/79
WNP 3/5 148 Changing Date of Resolution No. 147 to October 31, 1978 Erosion Control Program 10/23/78
WNP 3/5 147 Rescinding Resolution No. 126 & Order No. 543 with Conditions 10/9/78
WNP 1/4 146 Amending Resolution No. 134 9/11/78
WPPSS 145 Approval of design of the Priest Rapids Fish Hatchery Improvements with Conditions 5/8/78
WNP 3./5 144 Approval of Supplement to the Oil Spill Prevention and Counter Measures Plan with Conditions 8/14/78
WNP 1/4 143 Motion by Parties Seeking Hearing Dismissed 6/12/78
WNP 3/5 142 Rescinding Resolution No. 120 5/8/78
  141 Adoption of Temporary, Emergency Rule 3/27/78
  140 Actively Seeking Agreements with US Nuclear Regulatory Commission 3/27/78
Skagit 139 Approval of Required Plans with Conditions 3/27/78
Skagit 138 General Erosion Control Requirements  Constitutes Compliance with Requirements 3/27/78
Skagit 137 NPDES Approval of proposal Sediment Retention Facilities 3/27/78
Trans Mountain Oil Pipeline 136 Receipt of the Applicant's Notice of Withdrawal 3/27/78
WPPSS 135 Approval Acceptability of Criteria Regarding Chinook fry per year 3/13/78
WPPSS 134 Satisfied Requirements with Conditions 2/27/78
Skagit 133 Approval of Oil Spill Prevention and Counter Measures Plan 2/27/78
Columbia 132 Approval of Revised Environmental Monitoring Program 1/23/78
  131 Adoption of EPA Rule as WAC 463-18-040 1/9/78
Northern Tier Pipeline 130 Extension of Review period 12/27/77
Skagit 129 Reduce the Scope of the Ongoing Baseline Monitoring Activity with Regard to Terrestrial and Aquatic Biology 12/12/77
WNP 3/5 128 Rescinding Resolution No.  155 10/28/77
Skagit 127 Evidence of Insurance 9/26/77
WNP 3/5 126 WPPSS Shall Immediately Execute and Continue the Following Remedial Actions Supplemental to the Erosion Control Program 9/26/77
  125 Adoption as a Temporary, Emergency Rule 8/8/77
WPPSS 124 Satisfied Requirements of SCA with Provisions 7/25/77
Skagit 123 Accepts the Report on Pipelines Laid in the Bed of the Skagit River Near the Proposed Diffuser Site, Satisfaction of the First Portion of the NPDES 6/27/77
Columbia 122 Technical Committee Recommendations 6/27/77
Columbia & WNP 1/4 121 Revokes Approval to Temporarily Suspend the Benthic Monitoring Program and Concurs with the Implementation of the Benthic Monitoring Program with Conditions 5/9/77
WNP 3/5 120 Approval of Oil Spill Prevention and Counter Measure Plan 5/9/77
WNP 3/5 119 Agrees to Disposal of Slash and Stumps from Land Clearing by Controlled Burning  with Conditions 4/25/77
WNP 1/4 118 Approval Phases I & II with Conditions 4/11/77
Skagit 117 Requirements of General Condition G14 of NPDES Permit are Satisfied 3/14/77
WNP 3/5 116 Approval of the Required Qualification for the Consultant who will Carry Out All or any portion of the Environmental Monitoring Program 2/15/77
WNP 3/5 115 Approval of the Erosion Control Plan for the Access Road and Railroad. with Conditions 2/15/77
  114 Adoption of NPDES Rules  WAC 463-16 Repealed 1/3/77
  113 Adoption of Rules - WAC 463-42 Repealed WAC 463-12 1/24/77
  112 Repeal of WAC 463-08-024 11/22/76
  111 Adoption of Rules - WAC 463-46 Repealed WAC 463-08 11/22/76
  110 Adoption of Rules - WAC 463-50 11/8/76
  109 Adoption of Rules - WAC 463-26 Repealed WAC 463-08 11/8/76
  108 Adoption of Rules - WAC 463-54 10/25/76
  107 Adoption of Rules - WAC 463-34 10/25/76
  106 Adoption of Rules - WAC 463-22 10/25/76
  105 Adoption of Rules - WAC 463-18 10/25/76
  104 Adoption of Rules - WAC 463-10 Repealed WAC 463-08 10/25/76
  103 Adoption of Rules - WAC 463 Repealed WAC 463-20 10/25/76
  102 Adoption of Rule - WAC 197-10 with Exceptions 7/28/76
  101 Adoption of Rule - WAC 197-10 with Exceptions 5/10/76
      Top of Page
WNP 1 7-74 Notice of Initial Public Hearing to be held on July 8, 1974 6/10/74
WNP 1 6-74 According Official Application Effective Date 6/10/74
Skagit 5-74 Notice of Initial Public Hearing 4/8/74
Skagit 4-74 According Official Application 4/8/74
WNP 1 3-74 Extension of Time Allowed for Recommendation to the Governor 1/28/74
WNP 3 2-74 Notice of Initial Public Hearing 1/14/74
WNP 3 1-74 Receipt of the Initial Application 1/14/74
  5-73 Adoption of Emergency Rules 12/10/73
  4-73 Adoption of Emergency Rules 9/10/73
  3-73 Charles F Murphy 3/12/73
WNP 1 2-73 Notice of Initial Public Hearing 2/26/73
WNP 1 1-73 Receipt of Application 2/26/73
  1-72 Adoption of Emergency Rules 10/30/72
Columbia 2-71 Notice for Public Comment on EIS 11/22/71
Columbia 1-71 Notice of Initial Public Hearing 2/22/71

338

Amendment No. 4 - Cherry Point Cogeneration Project Transfer of SCA to BP West Coast Products, LLC

8/24/11

323

Amendment No. 3 - BP to fund a project that would reduce water use at In Talco and make the unused water available for use by the Cogeneration project

3/11/08

322

Amendment No. 2 - Transfer of SCA to New LLC, Removal of Certain Laydown Areas and Modification to Wetland Mitigation Provisions

3/11/08

320

Withdrawal of request to amend SCA and laydown use within NPDES permit

2/13/07

317

Amendment No. 1 to BP Cogen Site Certification Agreement

10/10/06

Bonneville Power Administration Projects

231
Amended

Taft Bell Transmission Line Construction and Council Closed its involvement.

4/14/86

220

Adopts the Work Program/Intent to review the Lower Monumental/ Ashe Transmission Corridor

3/12/84

Chehalis Generation Facility                                

325

Transfer to PacifiCorp, Termination of TNA Merchant Projects' Guaranty and Approve of Revise Site Restoration Plan

9/22/08

304

Water use mitigation - Hamilton Water Rights

3/10/03

301

Water use mitigation

11/12/02

Columbia Generating Station (formerly WNP-2)                                    Top of Page

332

Revisions to the Radiological Environmental Monitoring Program

2/21/12

326

Emergency Preparedness Offsite Agency Support

3/10/09

318

Removal of on-site Visitor's Center and closeout of Resolution No. 225

11/14/06

311

Emergency Preparedness Offsite Agency Support

1/11/05

310

Energy Northwest - Columbia Generating Station: Termination of  Non-Radiological Environmental Monitoring Program

4/19/04

307
(3.3 MB)

Energy Northwest - Disposal of Water Stored in WNP-1 and WNP-4 Service Water Ponds

9/8/03

295

Amending the CGS SCA to allow for construction and operation of Dry Cask Storage Facility at the project site

9/11/00

293

Energy Northwest Corporate Name Change

12/17/99

306

CGS Condenser Scale Removal

4/14/03

303

CGS Hydrogen Storage and Supply Facility

2/18/03

300

Columbia Generating Station Sanitary Waste Treatment Facility

9/10/01

299

Columbia Generating Station Cooling System Sediments

8/13/01

296

Hanford Wildlife Mitigation Project/Rattlesnake Slope Rehabilitation

11/13/00

293
Amd. 1

Energy Northwest Change of Corporate Name/CGS Change of Plant Name

9/11/00

292

Approving upgrading and site preparation plans for WNP-2

8/10/98

288

Approval of WNP-2 Landfill Closure Plan, Post-Closure Plan and Plan of Operations

11/10/97

287
Amd. 1

Approving FY 2002 EP funding levels for Columbia Generating Facility

6/19/01

287

Accepting WNP-2 EP Study Group Recommendations Report

11/10/97

286

Closure of WNP-2 NOI and Request for Assurance of Compliance concerning chlorination incidents in July 1996

9/8/97

278

Authorizes the Onsite Disposal of Cooling Tower Sediments

5/8/95

273

Increase Power Output

9/12/94

271

Closes Resolution No. 268 Water Discharge

8/8/94

260

Approval of Radiological Environmental Monitoring Program

1/13/92

259 - 1

Approval of Operation of Sanitary Waste Treatment Facility

11/14/94

258 Amended

Standby Service Water System

8/10/92

251

NPDES Condition G35 Fulfilled

6/11/90

249

Approval of the Use of Sodium Bromide as Bio fouling Agents with Conditions

5/14/90

244

Approval of Initial Site Restoration Plan

8/22/88

240

Adoption of Review Process for Circulating Water Additive Requests

12/14/87

230

OL Amendment Checklist Accepted

3/24/86

228

Approval of Deployment of Gamma Detectors

1/13/86

224

Compliance Determinations & Implementation of Corrective Action with Conditions

11/26/84

214

Approval of Ecological Monitoring Program

11/8/82

209

Requirements of Order No. 544 Fully Satisfied

8/9/82

201

Deems Study of Effects of Non-toxic Chlorine Enhancement Agents and Corrosion Inhibitors on Biocidal Efficiency to Be properly within the Scope of the Chlorination Studies Required with Conditions

1/25/82

192

Attachment 1 WNP-2 SCA Revision 2

5/26/81

186

Pre-Operational Monitoring Program as Proposed shall be deemed to Satisfy the Monitoring Requirements of the NPDES

11/24/80

152

Granting Relief from Monitoring of the Emissions of the Emergency Diesel Engines and Auxiliary Boiler

6/11/79

132 Approval of Revised Environmental Monitoring Program 1/23/78
122 Technical Committee Recommendations

6/27/77

2-71 Notice for Public Comment on EIS 11/22/71
1-71 Notice of Initial Public Hearing 2/22/71

Columbia Generating Station and Washington Nuclear Project 1 & 4      Top of Page

268
268-1

NPDES Closes Resolution No 258
SCA Amendment

10/11/93
5/16/94

266

Non-radiological Environmental Monitoring Program

5/10/93

239

Approval of Revision No 3 - Review of Environmental Monitoring Program for WNP 2

9/14/87

238

Approval of the Wildlife Mitigation Plan with Conditions

5/1/87

225

Visitors Center with Conditions

12/10/84

223

Approval of Termination of Sampling at the Three Burned Sampling Sites

10/29/84

194

Approval of Adopted Terrestrial Monitoring Component of the Environmental Monitoring Program

5/26/81

193

Approval of the Adopted Terrestrial Monitoring Component of the Environmental Monitoring Program

5/26/81

175

Approval of the Adoption of Terrestrial Monitoring Component of the Environmental Monitoring Program

4/28/80

174

Approval of the Sanitary Waste Disposal System

4/28/80

166

Grants Termination of the Preoperational Aquatic Ecology Data Collection for WNP 2, 1/4

3/24/80

157

Not requiring Scientific Collector permits for the Conduct of Studies

9/24/79

Cowlitz Cogeneration Project                                                               Top of Page

308

Cowlitz Cogeneration Project - Termination of Site Certification Agreement

3/1/04

290

Concluding that Chehalis Power's Report of November 6, 1997 satisfies the SCA requirements for consultation and reporting on the best means of gauging the Centralia Reach of the Chehalis River

12/8/97

281

Cowlitz SCA to extend for 18 months and removing Mission Energy as a co-sponsor

2/12/96

272

SCA Amendment

9/12/94

268
268-1
NPDES Closes Resolution No 258
SCA Amendment
10/11/93
5/16/94

267

Demolition of Plywood Mill

9/13/93

Creston Generating Station

294

Avista Corporation termination of SCA for Creston Generating Station

1/24/00

279

Termination of Creston Generating Station SCA

5/9/95

247

Approval of Initial Site Restoration Plan

6/26/89

241

SCA shall continue in full force and effect during Council consideration of WWP Application Amendment

2/8/88

219

Approval of Recommendation and the Lincoln County Agriculture Coalition be granted membership

7/25/83


Kittitas Valley Wind Power Project                                                       Top of Page

328

Amendment No. 1 to the Site Certification Agreement

9/2/09


KVA Power - Northwest Regional Power Facility

274

Assignment of ALJ Wallis

10/10/94

289

Approving the KVA water pipeline design and location

12/8/97

285

Land Management Plan Conditions

9/8/97


Northern Tier Pipeline

191

Establishing a Steering Committee for the Purpose of Organizing and Managing the Review of the Contested Case Record

3/23/81

163

Council Adoption of Procedures to Regulate the processing of Application No. 76-2

2/25/80

159

Adoption of Structure and Regulation for the Conduct

11/13/79

155

Intent to Commence the Contested Case Hearing

9/10/79


Satsop Combustion Turbine  1 & 2

312

Modifications to the Satsop Combustion Turbine Project Site Certification Agreement

1/11/05

309

Satsop Combustion Turbine Project - Technical Amendment - Water Use Provisions

4/19/04

298

Technical amendments regarding facility design and backup fuel source at Satsop CT Site

4/13/01

297

Addition of Duke Energy Grays Harbor LLC as Satsop CT SCA co-holder and co-permittee

2/12/01

283

Deferring installation of the river flow monitoring gauge at the Satsop CT project

5/12/97


Skagit Nuclear Power Project Units 1 & 2                                              Top of Page
139 Approval of Required Plans with Conditions 3/27/78
138 General Erosion Control Requirements Constitutes Compliance with Requirements 3/27/78
137 NPDES Approval of Proposal Sediment Retention Facilities 3/27/78
133 Approval of Oil Spill Prevention and Countermeasures Plan 2/27/78
129 Reduce the Scope of the On-going Baseline Monitoring Activity with Regard to Terrestrial and Aquatic Biology 12/12/77
127 Evidence of Insurance 9/26/77
123 Accepts the Report on Pipelines Laid in the Bed of the Skagit River near the Proposed Diffuser Site, Satisfaction of the First Portion of the NPDES 6/27/77
117 Requirements of General Condition G14 of NPDES Permit are Satisfied 3/14/77
5-74 Notice of Initial Public Hearing 4/8/74
4-74 According Official Application 4/8/74

Sumas 2 Generation Facility

316

Sumas 2 Generation Facility - Termination of Site Certification Agreement

5/9/06


Trans Mountain Oil Pipeline

262

Low Point Application Submittal with Conditions

3/9/92

181

Extension of the 12-Month processing period

8/11/80

136 Receipt of the Applicant's Notice of Withdrawal 3/27/78

Wallula Generation

305

Modifications to the Corporate Structure of Site Certificate Holder - Wallula Generation LLC

3/10/03


Wild Horse Wind Power Project Application No. 2004-01

321

Amendment No. 4 - Approval of Solar Demonstration Project

4/10/07

319

Amendment No. 3 - Installation of exempt well

2/13/07

315

Amendment No. 2 to the Wild Horse Wind Power Project Site Certification Agreement

7/26/05

314

Modifications to the Wild Horse Wind Power Project Site Certification Agreement

7/26/05


Washington Nuclear Projects 1 & 4 (WNP 1/4)

330

Amendment No. 2 to the Site Certification Agreement

4/13/10

313

WNP-1/4 Site Restoration - Offsite Environmental Mitigation

7/12/05

302

Site Restoration Plan Approval

12/9/02

280 Site Restoration; Close out of Resolutions 243,245 & 246 6/12/95

243

Approval of Initial Site Restoration Plan for WNP 1 upon the Approval of Site Restoration Plan of WNP 4

8/22/88

235

Removal of Wood Waste on WNP 1 & 4 by Controlled Burning of Wood Waste with Conditions

8/25/86

234

Statement of Compliance with SCA Conditions on WNP 1/4

8/25/86

146 Amending Resolution No. 134 9/11/78
118 Approval Phase I & II with Conditions 4/11/77
7-74 Notice of Initial Public Hearing to be held on July 8,1974 6/10/74
6-74 According Official Application Effective Date 6/10/74
3-74 Extension of Time Allowed for Recommendation to the Governor 1/28/74
2-73 Notice of Initial Public Hearing 2/26/73
1-73 Receipt of Application 2/26/73

Washington Nuclear Projects 3 & 5 (WNP 3/5) now the Satsop Site       Top of Page

284

Granting temporary waiver of water quality standards to complete bank protection repairs at the barge unloading facility at the WNP-3/5 Site

8/18/97

277

Timber Harvest Proposal Conditions

4/10/95

276

Excavate 40 yards of Sediment with Conditions

3/13/95

275

Management of Wildlife Mitigation

11/14/94

265

Fire Water System

3/8/93

263

Closes Council Orders 656, 657 & 659

2/8/93

261

Approval of Forest Practices Application with Conditions

3/9/92

256

Permission to Burn the Slash and Alder Debris with Conditions

4/8/91

255

Approval of Timber Harvest with Conditions

4/8/91

254

Approval of Satsop Power Plant Site Wildlife Mitigation Plan

8/13/90

252

Approval of Timber Harvest with Conditions

7/9/90

250

Approval of Forest Road Construction

5/14/90

248

Adopts Interim Agreement on Wildlife Mitigation and Timber Management

8/28/89

245

Approval of Initial Site Restoration Plan for WNP 3 upon Approval of Site Restoration Plan of WNP 5

8/22/88

242 - 2

Approval of Continued Use of the Septic Tank System with Conditions

6/13/94
4/11/88
4/11/88

237

Abide by an Oil Spill Prevention and Countermeasure Plan and Hazardous Waste Management Procedure with Conditions

12/8/86

236

Storm Water Runoff Chemical Treatment Facility for NPDES

12/8/86

233

Close of multiple Resolutions

6/9/86

232

Conditions Satisfied - Erosion Control during Construction

6/9/86

227

NPDES Closes Multiple Resolutions

8/26/85

226

Water Quality Sampling Program Closes Multiple Resolutions

8/26/85

222

Grants a Temporary Waiver of the Water Quality Standards with Conditions

6/11/84

221

Hydrazine and Cortec may be Discharged as part of the Metal Cleaning Waste Water Stream with Conditions

6/11/84

218

Fulfilled Condition VI.A.1 of SCA

7/11/83

217

Closes Multiple Resolutions

5/23/83

216

Closes Multiple Resolutions Authorizes a Reduction in the Erosion Control Program with Conditions

3/28/83

215

Approval of Construction Plans/Temporary Waiver of Water Quality Standards with Conditions

11/22/82

213

Approval of Increase in the Inventory of Mineral Oil and the Storage of Transformers

11/8/82

212

Authorize the Requested Extension of the In-River Work Time Window

9/13/82

211

Terms and Conditions of Resolution #160 Fully Met and Satisfied

8/23/82

210

Terms and Conditions of Resolution No 178 Fully Met and Satisfied

8/9/82

208

Approval of Concept of the Approach Outlined in the Decommissioning Process with Conditions

7/26/82

207

Turbidity Waiver for Supplemental Dredging and desilting Operations

7/26/82

206

Temporary Waiver of the Water Quality Standards with Conditions

7/12/82

205

Multipurpose Facility for WNP 3/5, Visitor Center, Emergency Operations, and Training Supersedes Resolution No. 199

6/28/82

204

Approval of Construction Plans for Installation of the Makeup Piping and Electrical Cables/Granting Temporary Waiver Water Quality Standards

5/24/82

203

Approval of Construction  Plans for Installation of Discharge Piping and Blow down Diffuser Granting Temporary Waiver of Water Quality Standards

2/22/82

202

Approval of Procedure Manual for Bioassay Program

2/22/82

200

Approval of Modifications in the Environmental Monitoring Program

1/11/82

199

Affirms the concept of a multipurpose Facility for Visitor Center, Emergency Operations Facility, Control Room and Training Office with Conditions

10/26/81

197

Approval of Oil Spill Prevention and Countermeasures/ Rescinding Resolutions # 149 & 158

8/24/81

195

Approval of Modification to Ecological Monitoring

6/22/81

190

Granting a Turbidity Waiver  for Supplemental Dredging and Disilting Operations Associated with the Barge Unloading Facility with Conditions

3/23/81

189

Grant a Temporary Waiver of the Water Quality Standards with Conditions

3/9/81

188

Council Finds that the New Programs will Adequately Protect and further Reduce the Impact on the Environment.

1/26/81

187

Rescinding Resolution No 147

1/26/81

184

Contract for Water

10/27/80

183

Approval of Construction Plans for the Transporter Haul Road

9/22/80

182

Extend the Turbidity Waiver and Time period for Construction of Bank Protection on the North Shore of The Chehalis River

9/8/80

180

Grants a Turbidity Waiver during Construction Work With Conditions

 

179

Grants Temporary Waiver of the Water Quality Standards with Conditions

6/9/80

178

Resolve of Resolution No. 147

5/27/80

177

Grants Temporary Waiver of the Water Quality Standards with Conditions

5/12/80

173

Grants Temporary Waiver of the Water Quality Standards with Conditions

4/28/80

172

Approval of Extension of the Turbidity Waiver for the F-3 Pump Pond Effluent with Conditions

4/28/80

171

Rescinding Resolution No. 128

4/28/80

170

Approval of Construction o the Make-up Well System as proposed with Conditions

4/28/80

169

Grants a Temporary Waiver of the Water Quality Standards with Conditions

4/28/80

167

Rescinding Resolution No. 124

4/14/80

165

Approval of Proposed Objectives and General Design of the WNP 3/5 Facilities and Concept only

3/24/80

164

Rescinding Resolution No. 154

3/10/80

162

Approval of Single Surface Water Sampling Site to Determine Background Level

2/1/80

161

US Geological Survey Flow Gauge Established for Chehalis River

12/10/79

160

Rescinding Resolution No. 147

11/13/79

158

Approval of Supplement to Oil Spill Prevention and Countermeasure Plan with Conditions

10/29/79

156

Application for Modification of the Site Certification Agreement is Dismissed

8/27/79

154

Grants Approval for Construction of the Pioneer Rd with Conditions

8/13/79

153

Approval of Erosion Control Plan with Conditions

7/9/79

151

Approval to Remove P-1, P-3 and W-1 Pump Stations

6/11/79

150

Granting a Turbidity Waiver during Construction of the Laydown Area with Conditions

6/11/79

149

Rescinded Council Resolutions 142 & 144 with Conditions

6/11/79

148 Changing Date of Resolution No. 147 to October 31, 1978 Erosion Control Program 10/23/78
147 Rescinding Resolution No. 126 & Order No. 543 with Conditions 10/9/78
142 Rescinding Resolution No. 120 5/8/78
128 Rescinding Resolution No. 155 10/28/77
126 WPPSS Shall Immediately Execute and Continue the Following Remedial Actions Supplemental to the Erosion Control Program 9/26/77
120 Approval of Oil Spill Prevention and Counter Measure Plan 5/9/77
119 Agrees to Disposal of Slash and Stumps from Land Clearing by Controlled Burning with Conditions 4/24/77
116 Approval of the Required Qualification for the Consultant who will Carry out all or any portion of the Environmental Monitoring Program 2/15/77
115 Approval of the Erosion Control Plan for the Access Road and Railroad with conditions 2/15/77

246

Approval of Petition to Postpone Consideration of Site Restoration Plans for WNP 4 & WNP 5 with Conditions

10/10/88
Amended 1/14/91

145 Approval of Design of the Priest Rapids Fish Hatchery Improvements with Conditions 5/8/78
135 Approval Acceptability of Criteria Regarding Chinook Fry Per Year 3/13/78
134 Satisfied Requirements with Conditions 2/27/78
124 Satisfied Requirements of SCA with Provisions 7/25/77