Access WashingtonEFSEC Banner

The Council and it's Jurisdiction
How the Certification Process Works
Facilties Under Review or Certified
Laws Rules & Policies
Rulemaking
Council Meetings
Staff Contacts
Site Map
Links
EFSEC Home

Tesoro Savage Vancouver Energy Distribution Terminal

Application

NOTE: Some files may take several minutes to open due to large size.

Application as Submitted   Amendment to Application by Section   Amended Incorporated Revised Revised Revised
August 2013   January 2014   February 2014 May 2016 August 2016 October 2016
            Revised Engineering
Report
 
Complete Volume I (872 Pages, 76.9 MB)
Complete Volume II (1318 Pages, 65 MB)
      Amended Volume I (826 Pages, 62.1 MB)
Amended Volume II (1604 Pages, 93.1 MB)
Volume1 of 6
(Parts 1 through 4)
(789 Pages, 46.7 MB)
Volume 2 through 6
(Part 5 Plus Appendices)
(1423 Pages, 165.8 MB)
  Volume 1 of 6
(Parts 1 through 4) - Change history
Cover Letter   Cover Letter   Cover Letter Cover Letter   Cover Letter
Table of Contents   Table of Contents   Table of Contents Table of Contents   Table of Contents
Application Comment Matrix   Application Page Replacement Guide   Application Page Replacement Guide Change List   Change List
Part 1 - General       Part 1 -
General
Part 1
General

General - Showing Revisions
  Part 1
General - May 2016

General - Oct 2016 Change history
Description of Applicant
Section 1.1
             
Designation of Agent
Section 1.2
             
Assurances Section 1.3              
Mitigation Measures
Section 1.4
  Section 1.4          
Sources of Information
Section 1.5
  Section 1.5   Revised 8/2014
Section 1.5
     
Consultation
Section 1.6
             
Part 2 - Proposal       Part 2 -
Proposal
Part 2 -   
Proposal

Proposal - Showing Revisions
  Proposal - May 2016

Proposal - Oct 2016 Change history
Section 2.1   Section 2.1          
Legal Description Ownership Interests
Section 2.2
  Section 2.2          
Construction on Site
Section 2.3
             
Energy Transmission Systems
Section 2.4
             
Electrical Transmission Facilities
Section 2.5
             
Water Supply System
Section 2.6
             
System of Heat Dissipation
Section 2.7
             
Characteristics of Aquatic Discharge Systems
Section 2.8
             
Wastewater Treatment
Section 2.9
             
Spill Prevention and Control
Section 2.10
  Section 2.10          
Surface Water Runoff
Section 2.11
  Section 2.11          
Emission Control
Section 2.12
  Section 2.12   Revised 8/2014
Section 2.12
     
Carbon Dioxide Mitigation
Section 2.13
             
Greenhouse Gases Emissions Performance Standards
Section 2.14
             
Construction & Operation Activities
Section 2.15
  Section 2.15          
Construction Management
Section 2.16
  Section 2.16          
Construction Methodology
Section 2.17
  Section 2.17          
Protection from Natural Hazards
Section 2.18
  Section 2.18          
Security Concerns
Section 2.19
  Section 2.19          
Study Schedules
Section 2.20
  Section 2.20          
Potential Future Activities On-Site
Section 2.21
  Section 2.21          
Analysis of Alternatives
Section 2.22
  Section 2.22          
Pertinent Federal, State & Local Requirements
Section 2.23
  Section 2.23          
Part 3 -
Natural Environment
      Part 3 -
Natural Environment
Part 3 -
Natural Environment

Natural Environment - Showing Revisions
  Part 3
Natural Environment - May 2016

Natural Environment - Oct 2016 Change history
Earth
Section 3.1
  Section 3.1          
Air Section 3.2   Section 3.2   Revised 8/2014
Section 3.2
     
Water
Section 3.3
  Section 3.3          
Habitat, Vegetation, Fish & Wildlife
Section 3.4
  Section 3.4          
Wetlands Section 3.5   Section 3.5          
Natural Resources
Section 3.6
             
Part 4 -
Built Environment
      Part 4 -
Bulit Environment
Part 4
Built Environment

Built Environment - Showing Revisions
  Part 4
Built Environment - May 2016

Built Environment - Oct 2016 Change history
Environmental Health
Section 4.1
  Section 4.1          
Land & Shoreline Use
Section 4.2
  Section 4.2          
Transportation
Section 4.3
  Section 4.3          
Socioeconomic Impact
Section 4.4
  Section 4.4          
Part 5 -
Applications for Permits & Authorizations
      Part 5 -
Applications for Permits & Autorizations
Part 5 -
Applications for Permits & Authorizations

Applications for Permits & Authorizations - Showing Revisions
  Part 5 -
Applications for Permits & Authorizations (Parts 1-3)
Air Emissions Permits & Authorizations
Section 5.1
  Section 5.1   Revised 8/2014
Section 5.1

Attachment 1 Best Available Control Technology (BACT) Analysis
Attachment 2 Emission Calculations Spreadsheet
Attachment 3 January 24, 2014 Response to EFSEC and EPA Comments
    Section 5.1
Application for Permits & Authorizations
Wastewater Permit Application Section 5.2             Section 5.2
Wastewater/Stormwater Discharge Permit Application
Stormwater Discharge Permit Application
Section 5.3
  Section 5.3     Section 5.3
Stormwater Discharge Permit Application
Section 5.3 Appendices
App A NOAA Isopluvial Maps for WA
App B FEMA FIRMs
App C Stormwater Facility Design Plans
App D Existing Drainage Reports
App E WQ Model Results
App F Conveyance System Model Results
App G Oil Water Separator Sizing Calculations
App H WQ Vault Sizing Calculations
App I Geo Reports
App J MSDSs
App K Wastewater Permit Application
App L Stormwater Permit Application
App M Utility Letters
Application for City of Vancouver Waste Water Discharge Permit         Application for City of Vancouver Waste Water Discharge Permit    
Appendices       Table of Contents Table of Contents   Table of Contents
Tribal Consultation; Tribal Letters
Appendix A
  Appendix A   Appendix A Appendix A.1   Appendix A.1
Geoarchaeological Investigation Report
Appendix A.2
        Appendix A.2   Appendix A.2
Inadvertaent Discovery Plan
Appendix A.3
        Appendix A.3   Appendix A.3
Contingency Planning Memorandum
Appendix B.1
      Appendix B.1 Appendix B.1   Appendix B.1
Spill Prevention Control & Countermeasure Plan
(SPCCP) Preliminary Outline Appendix B.2
  Appendix B.2   Appendix B.2 Appendix B.2   Appendix B.2
    Oil Spill Contingency Plan
Appendix B.3 Addition
  Appendix B.3 Appendix B.3   Appendix B.3
Oil Spill Contingency Plan
Appendix B.4
        Appendix B.4   Appendix B.4 REVISED
Appendix B.4 Additional Information
Appedix B.4 Appendicies:
App A Training and Excercises
App B Response Equipment
App C Facility Operations
App D Hazard Evaluation/Risk Analysis
App E Cross Reference
App F Techniques and Guidelines
App G Prevention and Maintenance
App H Trajectory Analysis
App I Acronyms and Definitions
Facility Oil Handling Plan
Appendix B.5
        Appendix B.5   Appendix B.5
Appendix B.5 Appendices:
App A Facility and Dock Plot Plans
App B USCG Jurisdiction Map
App C MSDSs
App D Response Equipment
App E Response Equipment Instructions
App F Declaration of Inspection Form
App G Example Maintenance and Inspection Forms
App H General Inspection, Maintenance, and Product Control Procedures
App I Example of Oil Transfer Load Plan
App J Example of Advance Notice of Oil Transfer Form
App K Safe and Effective Threshold Determination Report
App L Unsafe Operating Conditions
App M Pre-Booming Transfer Plan
App N Regulatory Cross Reference
Spill Response Excerise Report
Appendix B.6
        Appendix B.6   Appendix B.6
Stormwater Pollution Prevention Plan (SWPPP) Appendix C       Appendix C Appendix C.1   Appendix C.1
Appendix C.1 Appendices:
App A Site Plan
App B Existing Reports
App C FEMA FIRM Maps
App D Geotechnical Reports
App E NOAA Isopluvial Maps for WA
App F Construction Calculations
App G EC Drawings
App H Construction BMPs
App I Example Permit
App J Alternative BMPs
App K Historical Data
App L Inspection Forms
App M Cap Restoration Details
Operations Stormwater Pollution Prevention Plan (SWPPP)
Appendix C.2
        Appendix C.2   Appendix C.2
Appendix C.2 Appendices:
App A Site Plans
App B Training Log
App C Industrial Stormwater Monthly Inspection
App D Individual Industrial Stormwater Permit - Pending
App E Permit Coverage Letter - Pending
App F Sample Collection Form
App G SWPPP Certification Form
Project Health, Safety, Security, Environmental (HSSE) Plan
Appendix D
      Appendix D Appedix D.1   Appendix D.1
Construction Safety Manual
Appednix D.2
        Appendix D.2   Appendix D.2
Operations Safety Plan
Appendix D.3
        Appendix D.3   Appendix D.3
Construction Safety Plan
Appendix D.4
        Appendix D.4   Appendix D.4
City Utility Authorizations Appendix E   Appendix E   Appendix E      
Facility Site Legal Description
Appendix E.1
        Appendix E.1   Appendix E.1
Port of Vancouver Lease (excerpts)
Appendix E.2
        Appendix E.2   Appendix E.2
Preliminary Stormwater Report Appendix F       Appendix F      
Contaminate Media Management Plan, revised
Appendix F.1
        Appendix F.1   Appendix F.1
Water Quality Protection and Management Plan
Appendix F.2
        Appendix F.2   Appendix F.2
Material Safety Data Sheets (MSDS)
Appendix G
      Appendix G Appendix G   Appendix G
Biological Resources Report
Appendix H.1
  Appendix H.1   Appendix H.1 Appendix H.1

Appendix H.1 - Showing Revisions
  Appendix H.1
JARPA
Appendix H.2
  Appendix H.2   Appendix H.2 Appendix H.2   Appendix H.2
Marine Mammal Monitoring Plan
Appendix H.3
        Appendix H.3   Appendix H.3
Construction Wildlife Monitoring Plan
Appendix H.4
        Appendix H.4   Appendix H.4
Wake Standing in the Lower Columbia River Assessment
Appendix H.5
        Appendix H.5   Appendix H.5
Technical Report - Lower Columbia River Morphology and Fish Stranding
Appendix H.6
        Appendix H.6   Appendix H.6
Pre-Application Submittal to City
Appendix I.1
      Appendix I.1 Appendix I.1   Appendix I.1
Shoreline Management
Appendix I.2
      Appendix I.2 Appendix I.2

Appendix I.2
Showing Revisions
  Appendix I.2
Transportation Report
Appendix J
      Appendix J Appendix J.1   Appendix J.1
Construction Transportation Management Plan
Appendix J.2
        Appendix J.2   Appendix J.2
Socioeconomic Impact Report - Revised
Appendix K
  Appendix K   Appendix K Appendix K   Appendix K
    Geotechnical Report January 2014
Appendix L     Addition
  Appendix L      
Geotechnical Investigation - Upland Facility
Appendix L.1
        Appendix L.1   Appendix L.1
Geotechnical Investigation - Dock Facility
Appendix L.2
        Appendix L.2   Appendix L.2
Ground Improvement Design - Areas 300 and 400
Appendix L.3
        Appendix L.3   Appendix L.3
Response to EFSEC Plan Review
Appendix M
        Appendix M   Appendix M
Fire Safety Design
Appendix N.1
        Appendix N.1   Appendix N.1
Life Safety Design
Appendix N.2
        Appendix N.2   Appendix N.2
Structural Design Drawings
Appendix O.1
        Appendix O.1   Appendix O.1
Storage Tank Design Calculations
Appendix O.2
        Appendix O.2   Appendix O.2
DNVGL Vessel Risk Study
Appendix P.1
        Appendix P.1   Appendix P.1
DNVGL Vessel Risk Study
Appendix P.2
        Appendix P.2   Appendix P.2
Baker Risk Assessment
Appendix P.3
        Appendix P.3   Appendix P.3
New Appendices             Table of Contents
              Appendix A.4 Cultural Resources and Shoreline Erosion (Coming soon)
              Appendix B.7 Current Buster 6 (Coming soon)
              Appendix B.8 Spokane Tesoro Boom
              Appendix D.5_1 Principles of Operation and Marine Assurance
              Appendix D.5_2 Marine Assurance
              Appendix H.5 Wake Stranding in the Lower Columbia River Assessment (Revised)