BP Cherry Point Cogeneration Project

Potential Site Study


Potential Site Study:

  • On March 12, 2001, BP Cherry Point Refinery, requested that EFSEC initiate a Potential Site Study (PSS) for a 750 Megawatt gas fired cogeneration power plant to be situated in Whatcom County, Washington. PSS Request Letter

  • Public Meeting,
    May 2, 2001, Blaine, WA

  • On September 28, 2001, EFSEC completed the Potential Site Study Report.

More information about EFSEC's review process and Potential Site Studies is available on our Certification page.

Top of page


Potential Site Study Report:

Table of Contents

Acronyms and Abbreviations

Introduction

Chapter I: Coordination and Interaction

Chapter II: Environmental Issues

1.0 Introduction

2.0 Description of the Proposed Project

3.0 Existing Conditions and Issues

Chapter II: Environmental Issues Figures

Figure 1: Vicinity Map

Figure 2: Comprehensive Plan Land Use Map

Figure 3: Zoning Map

Figure 4: Project Site Map

Figure 5: Simplified Cogeneration Flow Diagram

Figure 6: Expected Utility Interconnections with Refinery

Chapter III: Application Guidelines and Criteria

1.0 Introduction

2.0 ASC Cover Letter Guidelines and Criteria

3.0 ASC Part I Guidelines and Criteria for Responding to WAC 463-42

4.0 ASC Part II Guidelines and Criteria for the Environmental Report

Appendix A: U.S. and Canadian Agencies, Non-Governmental Organizations, and Media Invited to the Agency Meeting and/or the Open House/Public Meeting

Appendix B: Comments Received from U.S. and Canadian Agencies

Appendix B-1: U.S. Federal Agency Comments

Appendix B-2: U.S. State Agency Comments

Department of Ecology

Other State Agencies

Appendix B-3: U.S. Local Government Agency Comments

Appendix B-4: Canadian Agency Comments

Environment Canada and the GVRD

Other Canadian Agencies

Appendix B-5: Tribal Comments

Appendix B-6: Public Comments

Public 1

Public 2

Public 3

Public 4

Appendix C: Consolidated Comments by Topic

References


Top of page

Back to BP Cogen Page

Public Reference:

Copies of the BP Cherry Point Cogeneration Proposal Potential Site Study Report are available for Public Reference at the following locations:

Olympia, WA:

EFSEC
1300 S. Evergreen Park Drive S.W.
Olympia, WA
98504-7250
664-1345
Washington State Library
UTC Branch
1300 South Evergreen Park Drive SW
Olympia, WA
98504-7250
(360) 664-1199

Whatcom County, WA:

Ferndale Branch
Whatcom County Library
2222 Main Street
Ferndale, WA 98248
(360) 384-3647

Bellingham Library
210 Central Avenue
Bellingham, WA 98225
(360) 676-6860
Blaine Branch
Whatcom County Library
610 – 3rd Street
Blaine, WA 98230
(360) 332-8146

Whatcom County Library
205 – 4th Street
Lynden, WA 98264
(360) 354-4883
Everson Branch
Whatcom County Library
104 Kirsch Drive
Everson, WA 98247
(360) 966-5100
Lummi Island Branch
Whatcom County Library
2144 South Nugent Road
Lummi Island, WA 98262
(360) 758-7145

Top of page

Back to BP Cogen Page

How to Obtain a Copy:

The BP Cherry Point Cogeneration Project Potential Site Study Report is available to interested persons upon request in hard copy or as a CD-ROM. To obtain a copy contact:

Energy Facility Site Evaluation Council
1300 S. Evergreen Park Drive S.W.
PO Box 47250
Olympia, WA 98504-7250
(360)664-1345

or by e-mail: efsec@utc.wa.gov

Top of page

Back to BP Cogen Page


Home Page | About EFSEC | Certification | Energy Facilities 
Laws & Rules
|
Rulemaking | Meetings | Staff Contacts  
Site Map | Links | Privacy Notice   

Access Washington Logo  

www.efsec.wa.gov
Question or Comment? Contact EFSEC at efsec@utc.wa.gov