Access Washington EFSEC Banner

The Council and it's Jurisdiction
How the Certification Process Works
Facilties Under Review or Certified
Laws Rules & Policies
Rulemaking
Council Meetings
Staff Contacts
Site Map
Links
EFSEC Home

Wild Horse Wind Power Project

Supplemental Environmental Impact Statement


These environmental documents were prepared to support Puget Sound Energy's 2008 request to expand the Wild Horse Wind Power Project.

  • Final Supplemental Environmental Impact Statement January 2009
  • Draft Supplemental Environmental Impact Statement November 2008

Final Supplemental Environmental Impact Statement

The Wild Horse Wind Power Project Final Supplemental EIS was issued on January 14, 2009.

Cover letter
Final Supplemental Environmental Impact Statement
Appendix A - Comments on the SEPA Checklist
Appendix B - Applicant Responses to Checklist Comments
Appendix C - 2007 Baseline Wildlife and Habitat Study
Appendix D - 2008 Rare Plant Survey/Sage-grouse Lek Survey
Appendix E - 2007 First-Year Operation and Wildlife Monitoring Report
Appendix F - 2008 Aerial Raptor and Sage-Grouse Surveys
Appendix G - 2008 Visual Impact Study
Appendix H - 2008 Cultural Report Summary
Appendix I - 2006 Baseline Survey Protocols and WDFW Response Letter
Appendix J - 2008 Post-Construction Habitat Restoration Monitoring Year 1 Report
Appendix K - 2008 Conservation Easement Correspondence

Draft Supplemental Environmental Impact Statement

The Wild Horse Wind Power Project Draft Supplemental EIS was issued on November 12, 2008. An Addendum to the DSEIS was issued on December 10, 2008


Public Reference:

Copies of the Wild Horse Wind Power Project FEIS are available for Public Reference at the following locations.

Kittitas:

Kittitas Public Library
NE corner 2nd & Pierce Streets
Kittitas, WA 98934

(509) 968-0226

Ellensburg:

Ellensburg Public Library
209 N Ruby
Ellensburg, WA 98926

509-962-7250

Olympia:

Washington State Library
Joel M. Pritchard Library
Point Plaza East, Building One
6880 Capitol Boulevard South
Tumwater, WA, 98501-5513

(360) 704-5200

Washington Energy Facility Site Evaluation Council
1300 S. Evergreen Park Drive
Olympia, WA, 98504-7250

360-664-1345

Top of page

How to Obtain a Copy:

The Wild Horse Wind Power Project FEIS is available to interested persons upon request in both hard copy and CD-ROM formats. To obtain a copy contact:

Energy Facility Site Evaluation Council
1300 S. Evergreen Park Drive
PO Box 47250
Olympia, WA 98504-7250
(360) 664-1345

or by e-mail: efsec@utc.wa.gov

Back to Wild Horse Wind Power Project Page

Top of Page

 

Home Page | About EFSEC | Certification | Energy Facilities
Laws & Rules | Rulemaking | Meetings | Staff Contacts
Site Map | Links | Privacy Notice

Access Washington Logo

www.efsec.wa.gov
Question or Comment? Contact EFSEC at efsec@utc.wa.gov