Home » EFSEC Document Set » EFSEC Document Set

The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage.
There will be two public comment meetings for the PEIS following the info meeting that was held on April 8th, 2025. The comment meetings will be on April 22nd and April 24th starting at 5pm PST. The April 8th meeting recording and information on how to join the comment meetings are on the PEIS webpage linked above. 

The Carriger Solar MDNS is available for comment April 7 through April 20 11:59 pm 

If you would like to submit a comment for either visit our comment database: https://comments.efsec.wa.gov/

EFSEC Document Set

Document Search

Goose Prairie Solar - One Energy Renewables

Application

Original Application

File Datesort descending Document Process Type
01/19/2021 Attachment J ~ Visual Impact Assessment Application Application
01/19/2021 Attachment I ~ Acoustic Assessment Report Application Application
01/19/2021 Attachment G ~ Plant and Big Game Assessment Application Application
01/19/2021 Redacted Attachment F ~ Wildlife and Habitat Survey Redacted Application Application
01/19/2021 Attachment B ~ Preliminary Site Plan Application Application
01/19/2021 Attachment E ~ Additional Site Maps Application Application
01/19/2021 Attachment P ~ Socioeconomic Application Application
01/19/2021 Attachment D ~ Vegetation and Weed Management Plan Application Application
02/08/2021 Appendix F - Land Owner List and Legal Descriptions Application Application
02/08/2021 Appendix S - Economic Impact Assessment Application Application
02/08/2021 Appendix E - Turbine and Acess Road Displacement Area Application Application
02/08/2021 Appendix U - Consultation Documents Application Application
02/08/2021 Appendix I Wetlands Water Delination Report Application Application
02/08/2021 Appendix V - TLG Transportation Study Application Application
02/08/2021 Appendix D - Preliminary County Zoning Determination Application Application
02/08/2021 Appendix T - Notice for Intent for National Pollutant Discharge Elimination System (NPDES) Application Application
02/08/2021 Appendix C - SEPA Checklist Application Application
02/08/2021 Original Application Submitted February 8, 2021 Application Application
02/08/2021 Appendix A - Decommissioning Plan Application Application
02/08/2021 Appendix B - Preliminary Geotech Report Application Application
02/08/2021 Original Application Cover Letter February 8, 2021 Application Letter
02/08/2021 Appendix N - Revegetation and Noxious Weed Control Plan Application Application
02/08/2021 Appendix K - REDACTED Biological Reports Application Application
02/08/2021 Appendix J Water Source Documentation Application Application
02/08/2021 Appendix Q - Visual Simulation Application Application
02/08/2021 Appendix H - Glare Analysis Report Application Application
02/08/2021 Appendix O - Acoustic Modeling Results by Noise Sensitive Receptor Application Application
02/08/2021 Appendix G - Shadow Flicker Analysis Application Application
02/08/2021 Appendix P - Emergency Response Plan Application Application
03/17/2021 Appendix O additional information - Baseline Sound Survey Application Documents
10/07/2021 Attachment P - Visual and Glare Impact Assessment Application Application
10/07/2021 Attachment F - 2021 Rare Plant Survey Report Application Application
10/07/2021 Badger Mountain Original Application Cover Letter Application Application
10/07/2021 Attachment G - 2021 Wildlife and Habitat Survey Report Application Application
10/07/2021 Attachment H - Geotechnical Engineering Reports Application Application
10/07/2021 Attachment I - Wetland Delineation Report Application Application
10/07/2021 Attachment J - Preliminary Stormwater Management Plan Application Application
10/07/2021 Badger Mountain Original Application Main Application Application
10/07/2021 Attachment K - Preliminary Hydrology Report Application Application
10/07/2021 Attachment A - Maps Application Map