The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage.
There will be two public comment meetings for the PEIS following the info meeting that was held on April 8th, 2025. The comment meetings will be on April 22nd and April 24th starting at 5pm PST. The April 8th meeting recording and information on how to join the comment meetings are on the PEIS webpage linked above. 

The Carriger Solar MDNS is available for comment April 7 through April 20 11:59 pm 

If you would like to submit a comment for either visit our comment database: https://comments.efsec.wa.gov/

Transmission Programmatic EIS

How to Review

Interested persons can review the Draft Programmatic EIS on this website, or at library locations available here: Draft PEIS Library Access List.

Printed copies, or digital copies on USB drives, can be provided at cost of production to those who request them.

Contacts for the Project

Sean Greene
Email: Sean.Greene@efsec.wa.gov
Phone: (360)-485-1592

Patricia Betts
Email: Patty.Betts@efsec.wa.gov
Phone: (360)-974-9521

Draft Programmatic Environmental Impact Statement (EIS)

The Energy Facility Site Evaluation Council (EFSEC) is pleased to announce the release of the Draft Programmatic Environmental Impact Statement (EIS) for electrical transmission facilities with a nominal voltage of 230 kilovolts (kV) or greater. This Programmatic EIS was prepared in accordance with the Washington State Environmental Policy Act (SEPA) under Chapter 43.21C.405 of the Revised Code of Washington (RCW) and Chapters 197-11 of the Washington Administrative Code (WAC).

As directed by the Washington State Legislature in RCW 43.21C.405, this Draft Programmatic EIS analyzes potential direct, indirect, and cumulative impacts of the construction, operation and maintenance, and upgrade or modification of transmission facilities in the State of Washington.  It includes an analysis of potential impacts on the elements of the natural and built environment specified under RCW 43.21C.405(3), WAC 197-11-444, and WAC 463-60-535.

The Draft Programmatic EIS and supporting documents can be found below:

Draft PEIS Meeting Documents

For more information on the Programmatic EISs currently being developed by the WA State Department of Ecology on wind, solar, and green hydrogen, please visit their website: https://ecology.wa.gov/regulations-permits/sepa/clean-energy/programmatic-eis


How the Programmatic EIS will be Used

This Programmatic EIS analyzes the adverse environmental impacts of large electrical transmission facilities but does not analyze any specific transmission proposal. Any specific transmission facility proposal would require additional SEPA environmental review.  

This Programmatic EIS is unique from most other SEPA EISs. The Legislature directed it to be prepared in RCW 43.21C.405 and required analysis of additional topics in the EIS. Additionally, in RCW 43.21C.408 the legislature mandated that a SEPA lead agency for a transmission facility covered by this Programmatic EIS must consider this document in its environmental review. Furthermore, when the recommendations (mitigation measures) identified in this Programmatic EIS are implemented for site-specific proposals, those proposals “are considered to have mitigated the probable significant adverse project-specific environmental impacts under this chapter for which recommendations were specifically developed.”

This Draft Programmatic EIS is intended to:

  • Provide a broad environmental impact assessment
  • Facilitate streamlined planning
  • Support informed decision-making
  • Identify mitigation strategies
  • Initiate public and stakeholder engagement

The Geographic Scope, or Study Area, of this Draft Programmatic EIS includes areas throughout the State of Washington where transmission facilities are likely to be developed. For the purpose of this Draft Programmatic EIS, Tribal lands and undersea cables are not included in the Study Area. Additional information can be found in Section 1.5.1 Geographic Scope of the Programmatic EIS.

This Programmatic EIS is unique in another way. It includes a framework and requirements for project level environmental review that are separated into three categories: General Conditions, Avoidance Criteria, Mitigation Measures. Additional information can also be found in Sections 3.1.3.1 General Conditions, 3.1.3.2 Avoidance Criteria, and 3.1.3.3 Mitigation Measures of the Programmatic EIS.

Project-specific applications would include details about the precise location and site-specific conditions. For most elements of the environment, this Draft Programmatic EIS provides a GoldSET suitability map (see Section 3.1.6 Suitability Map) that, when incorporated with project-specific applications, could be used to facilitate more informative and efficient environmental planning.  


Review, Comment, and Public Meeting

EFSEC invites public review and comment on the Draft Programmatic EIS. A 30-day public comment period begins on March 31, 2025, ending on April 30, 2025, at 5:00 pm PDT.  During that time there will be a public informational meeting on April 8, 2025, and two public comment hearings on April 22 and April 24, 2025. Details on how to participate are given below:

Public Informational Meeting

Tuesday, April 8, 2025, from 5:00 pm to 8:00 pm PDT 

Submitting Comment

Public Comment Hearings

Tuesday, April 22, 2025, from 5:00 pm to 8:00 pm PDT

Thursday, April 24, 2025, from 5:00 pm to 8:00 pm PDT


Draft PEIS SEPA Scoping

A comment campaign was open from June 28, 2024 through July 28 2024 11:59pm PDT. 

There were two virtual public comment meetings held via Teams or phone:

Thursday, July 18, 2024 (5:00pm to 8:00pm PDT)

Tuesday, July 23, 2024 (5:00pm to 8:00pm PDT)

July 18, 2024 Public Comment Meeting

Or view on YouTube: https://youtu.be/Rx2xjcrwLB8

July 23rd, 2024 Public Comment Meeting

Or view on Youtube: https://youtu.be/Sv3Pbnl83bw?si=H1QLYuJPcvWBuzIz

Transmission PEIS - Scoping Comments

Document Title Document Date
001 08/27/2024
002 08/27/2024
003 08/27/2024
004 08/27/2024
005 08/27/2024
006 08/27/2024
007 08/27/2024
008 08/27/2024
009 08/27/2024
010 08/27/2024
011 08/27/2024
012 08/27/2024