Wild Horse Wind Power Project Permits
Permits
Document Title | Document Date | |
---|---|---|
Construction Stormwater General Permit | 04/02/2009 |
The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage. If you would like to submit a comment visit our comment database: https://comments.efsec.wa.gov/
Document Title | Document Date | |
---|---|---|
Construction Stormwater General Permit | 04/02/2009 |
© Copyright 2019 by the Washington State Energy Facility Site Evaluation Council (EFSEC)