You are here

Home » EFSEC Document » Goose Prairie Solar » Goose Prairie Solar / SEPA » Goose Prairie Solar / SEPA / docGroup » Goose Prairie Solar / SEPA / docGroup / MDNS

The Draft Transmission Programmatic Environmental Impact Statement (EIS) was released on March 31, 2025. To review the document visit the Transmission PEIS webpage
There has been an extension to comment on the Draft PEIS until May 15th. If you would like to submit a comment visit our comment database: https://comments.efsec.wa.gov

Goose Prairie Solar / SEPA / docGroup / MDNS

Goose Prairie Solar - One Energy Renewables - Docket:210012

Process Type Document Group(s) Document link File Date Document Set
SEPA Documents SEPA Checklist 06/24/2021 00034
Mitigated Determination of Non-significance (MDNS)
SEPA Documents Mitigated Determination of Non-significance 06/24/2021 00034
Mitigated Determination of Non-significance (MDNS)
SEPA Documents Staff memo 06/24/2021 00034
Mitigated Determination of Non-significance (MDNS)
SEPA Notice Public Notice 06/24/2021 00034
Mitigated Determination of Non-significance (MDNS)