Badger Mountain Solar

Douglas County

Facility status

Withdrawn

Energy type

  • Battery
  • Solar

Max generating capacity

--
Badger Mountain Solar was a proposed 200-megawatt (MW) solar photovoltaic (PV) generation facility with an optional 200-MW battery energy storage system (BESS). The proposed site was located approximately 3.5 miles east of East Wenatchee.

Public comments

We are accepting general comments for this facility. If you would like to submit a comment, please email, comments@efsec.wa.gov.
See all comments

Project team

Project contact
Assigned Council for the Environment
Yuriy Korol
Assistant Attorney General (AAG)
mail Email
Assigned site specialist
Joanne Snarski

Applicant or Certificate Holder

Timeline

Application received
Oct, 2021

Facility progress

A facility goes through five different stages. Click on one of the stages before to learn more about our siting process.

Open and upcoming public comment periods

There are no upcoming or open comment periods right now.

Upcoming hearings and meetings

There are no upcoming hearings or meetings right now.

About Badger Mountain Solar

On October 7, 2021, we received an application for site certification (ASC) from Aurora Solar, LLC, a wholly owned subsidiary of Avangrid Renewables LLC, for the Badger Mountain Solar project. We held a public informational meeting and land use hearing on November 17, 2021.

On March 13, 2022, our Council adopted Order 881 that determined the application to be inconsistent with local land use plans and zoning ordinances. Avangrid requested an extension of the processing time for their ASC on September 6, 2023. On June 27, 2024, sent us a letter stating their intention to pause permitting activities until further notice. They subsequently requested a further extension of their paused activities for an indefinite period in a letter dated April 2, 2025. 

On July 20, 2026, we received a letter from Avangrid requesting the withdrawal of their ASC.